Planning and Design of Dongtuo Central Fishery Port Project, in Lvshunkou District, DalianThe total land area of the port is 136,273 m2, including unloading shed, cold storage, trading market, parking lot, storage yard, comprehensive materials area, aquatic product processing area, administrative office area, catering, entertainment and living area, etc.
A new breakwater length of 570 m; 12 berths (including two new material berths and one reconstruction material berth) with the overall length of coastline reaching 655.7 m. -
Master Planning of the "13th Five-Year" Construction of the Key Fishery Port, DalianAccording to standards,15 central fishery ports (including 3 new ones) of Dalian are build and improved.
It is proposed to build terminals with length of 8.2km, a breakwater and wharf with length of 3.4km, a breakwater with length of 18.8km, a revetment with length of 11.1km,an approach bank with length of 1.7 km, to reinforce the original dam with length of 1.8 km, and to construct ancillary facilities including refrigeration plant, trading market, processing plant and law enforcement office b...... -
Planning and Design of Bachagou Fishery Port Project, in Changxing Island, DalianThe total land area of the planned port is 31,400 m2, including unloading shed, cold storage, product trading center, parking lot, comprehensive materials area, oil tank area, aquatic products processing area, administrative office, comprehensive law enforcement building, auxiliary building for life, etc.
Two 1000-DWT terminals with a total length of 166.6 m; Four fishery docks with a total length of 193.4 m; Three material wharfs with a total length of 180.7 m; The revetment with a length of 8...... -
Master Planning and Design of Jiangjunshi Central Fishery Port Project, in Wafangdian District, DalianThe total land area of the planned port is 94,120 m2, including unloading shed, cold storage, aquatic products trading center, parking lot, comprehensive materials area, oil tank area, aquatic products processing area, administrative office, comprehensive law enforcement building, catering and entertainment living area, etc.
Six fishery terminals with a total length of 210 m; A breakwater with a total length of 1313 m. -
Master Planning and Design of Pikou Central Fishery Port Project, in Pulandian District, DalianThe total area of port is 234,000 m2.
The land area of production facilities is 89,798 m2, including unloading shed, cold storage, aquatic products trading center, parking lot, comprehensive materials area, oil tank area, aquatic products processing area, administrative office area, comprehensive law enforcement building, catering and entertainment living area, etc.